Trident capacity use area 2022 groundwater evaluation report

Authors
Kemmer, Courtney
South Carolina Bureau of Water
Keywords
Groundwater--South Carolina--Charleston County , Groundwater--South Carolina--Berkeley County , Groundwater--South Carolina--Dorchester County , Water consumption--South Carolina--Charleston Region--Statistics
Abstract
The Trident Capacity Use Area (Trident Area), which includes the whole of Berkeley County, Charleston County, and Dorchester County, was the third of six currently designated areas of South Carolina’s Coastal Plain to be incorporated into the Capacity Use Program. In the parts of the state designated as a Capacity Use Area, a groundwater withdrawer is defined as, “a person withdrawing groundwater in excess of three million gallons during any one month from a single well or from multiple wells under common ownership within a one-mile radius from any one existing or proposed well” (Groundwater Use and Reporting Act, 2000).
Description
Loading...
Thumbnail Image
Issue Date
2022-10
Contributor
Date Accessioned
2022-11-16T15:24:07Z
Date Available
2022-11-16T15:24:07Z
Item Format
application/pdf
Media Type
Document
Item Language
English
Publisher
South Carolina State Library
Digital Collection
South Carolina State Documents Depository
Rights
Copyright status determined to be in the public domain on April 27, 2020 by United States Supreme Court ruling (Georgia et al., Petitioners v. Public.Resource.Org, Inc. : 590 U.S.__(2020))
Type
Text
Digitization Specifications
This South Carolina State Document was either saved from a document available publicly online in PDF format or converted to PDF using Adobe Acrobat DC.