2024-06-272024-06-272024-04https://dc.statelibrary.sc.gov/handle/10827/56495SCDOT is replacing the I-20 EB and WB bridges over the Wateree River along with completing any related roadway approach work along I-20 in Kershaw County near Camden, SC. The project will also rehabilitate two sets of overflow bridges to the east of the main river bridge and replace the I-20 EB pond bridge to the west of the main river bridge. The purpose of this project is to replace the existing bridge that requires significant maintenance reducing the delays caused by the frequent deck patching activities required to keep the existing bridge in operation.application/pdfDocumentRecords, documents, and information made available by the agencies of the South Carolina state government or its subdivisions are made accessible through the South Carolina State Library Depository and are protected under U.S. Copyright law (Title 17, U.S.C.) and South Carolina state law (Title 30 and 60, S.C.C.L.). Distribution rights are determined by the agency or author and users should contact the aforementioned for more information.Interstate 20, Bridges--South Carolina--Kershaw County--Maintenance and repairBridges--South Carolina--Kershaw County--Design and constructionI-20 Over Wateree River Bridge Replacement and Swamp Overflow Bridge RehabilitationsText