2012-09-132012-09-131997-01-21http://hdl.handle.net/10827/7965This report analyzes the differences in resource consumption and costs of uncontained versus contained development. The first situation is termed current or sprawl development; the second, compact growth. These costs will be viewed in four different substantive areas: (I) infrastructure provision, (2) housing costs, (3) land consumption, and ( 4) municipal cost revenue impacts.DocumentCopyright status undetermined. For more information contact, South Carolina State Library, 1500 Senate Street, Columbia, South Carolina 29201.Infrastructure (Economics)--South Carolina--CostsSouth Carolina infrastructure study. Report 2 B, Cost of sprawl savings related to technology reducing infrastructure needs and costsText