Loading...
Thumbnail Image
Publication

Phase 3 transmodeler settings and parameters : Carolina Crossroads I-20/I-26/I-126 corridor improvements Lexington and Richland Counties, South Carolina

South Carolina Department of Transportation
United States Federal Highway Administration
STV Group
Abstract
The analysis of modifications to the Modified selected Alternative (MSA) will be based on the TransModeler network for the MSA and the associated Project and Scenario files. The primary analysis will make use of the 2040 morning and afternoon peak hour scenarios, but information will be provided should interim year analyses, such as for a ‘year of failure analysis’, of the MSA is necessary for the 2020, 2030, and 2035 scenarios.
Issue Date
2022-08-30
Keywords
Bridges--Design and construction--Estimates--South Carolina--Richland County, Bridges--Design and construction--Estimates--South Carolina--Lexington County, Roads--Design and construction--Estimates--South Carolina--Richland County, Roads--Design and construction--Estimates--South Carolina--Lexington County
Type
Text
Rights
Copyright status determined to be in the public domain on April 27, 2020 by United States Supreme Court ruling (Georgia et al., Petitioners v. Public.Resource.Org, Inc. : 590 U.S.__(2020))
Digitization Specifications
This South Carolina State Document was either saved from a document available publicly online in PDF format or converted to PDF using Adobe Acrobat DC.