Phase 3 transmodeler settings and parameters : Carolina Crossroads I-20/I-26/I-126 corridor improvements Lexington and Richland Counties, South Carolina

Loading...
Thumbnail Image
Authors
South Carolina Department of Transportation
United States Federal Highway Administration
STV Group
Issue Date
2022-08-30
Type
Text
Item Language
Keywords
Bridges--Design and construction--Estimates--South Carolina--Richland County , Bridges--Design and construction--Estimates--South Carolina--Lexington County , Roads--Design and construction--Estimates--South Carolina--Richland County , Roads--Design and construction--Estimates--South Carolina--Lexington County
Research Projects
Organizational Units
Journal Issue
Alternative Title
Abstract
The analysis of modifications to the Modified selected Alternative (MSA) will be based on the TransModeler network for the MSA and the associated Project and Scenario files. The primary analysis will make use of the 2040 morning and afternoon peak hour scenarios, but information will be provided should interim year analyses, such as for a ‘year of failure analysis’, of the MSA is necessary for the 2020, 2030, and 2035 scenarios.
Description
Citation
Publisher
South Carolina State Library
Rights
Copyright status determined to be in the public domain on April 27, 2020 by United States Supreme Court ruling (Georgia et al., Petitioners v. Public.Resource.Org, Inc. : 590 U.S.__(2020))
Journal
Volume
Issue
PubMed ID
DOI
ISSN
EISSN