Improving the time and cost performance of construction and planning projects
-
Description:PDF DocumentMIME type:application/pdfFile Size:2.857Mb
Author
McCallum, William B.
Subject
South Carolina Budget and Control Board, General Services Division, Construction and Planning Unit; Public works--South Carolina--CostsDescription
The objectives of this study are to: Analyze, understand and develop tools to better manage the overall workload of the Construction & Planning Unit. -- Determine the historical project management cost as a predictor and benchmark for future costs -- Analyze, understand and develop tools to better distribute the work of the unit across its project managers -- Determine the historical duration of projects as a predictor and benchmark of future time performance.Collections
Date
2008-02-18Metadata
Show full item recordDate Accessioned | 2012-04-12T18:24:31Z |
Date Available | 2012-04-12T18:24:31Z |
dc.description | The objectives of this study are to: Analyze, understand and develop tools to better manage the overall workload of the Construction & Planning Unit. -- Determine the historical project management cost as a predictor and benchmark for future costs -- Analyze, understand and develop tools to better distribute the work of the unit across its project managers -- Determine the historical duration of projects as a predictor and benchmark of future time performance. |
Media Type | Document |
Item Language | English |
Publisher | South Carolina State Library |
Digital Collection | South Carolina State Documents Depository |
Rights | Copyright status undetermined. For more information contact, South Carolina State Library, 1500 Senate Street, Columbia, South Carolina 29201. |
Type | Text |
Digitization Specifications | 300ppi, Epson Expression 10000xl flatbed scanner with Adobe Acrobat X Standard software; online version and Archival Master is a PDF/A-1b. Color depth varies by collection: 24-bitcolor, 8-bit grayscale, or black & white. |