Show simple item record

dc.creatorCollier, Brad
dc.date.accessioned2012-03-27T18:08:15Z
dc.date.available2012-03-27T18:08:15Z
dc.date.issued2000-02-22
dc.identifier.urihttp://hdl.handle.net/10827/6239
dc.descriptionThe South Carolina Department of Health and Environmental Control (DHEC) is responsible for the issuance of permits required for the installation of individual sewage treatment and disposal systems for all dwellings and businesses that are not able to connect to public sewer. The average standard turnaround time (the elapsed time from when an application is received to the time a permit is issued) is expected to be ten (10) to twelve (12) working days, as agreed by DHEC. The goal is to increase the efficiency of the application/permitting process and reduce the turnaround time required for the issuance of a permit.
dc.format.mediumDocument
dc.languageEnglish
dc.publisherSouth Carolina State Library
dc.relation.ispartofSouth Carolina State Documents Depository
dc.rightsCopyright status undetermined. For more information contact, South Carolina State Library, 1500 Senate Street, Columbia, South Carolina 29201.
dc.subjectSewage--Purification--Licenses--South Carolina
dc.subjectSouth Carolina Department of Health and Environmental Control, Wateree Health District
dc.subjectLicenses--South Carolina
dc.titleAnalysis of the application/permitting procedure
dc.typeText
sd.specifications300ppi, Epson Expression 10000xl flatbed scanner with Adobe Acrobat X Standard software; online version and Archival Master is a PDF/A-1b. Color depth varies by collection: 24-bitcolor, 8-bit grayscale, or black & white.


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record