Correspondence from Alton C. Boozer to Ms. Elizabeth Jones - Request for Final TMDL Approval with Attachment
-
Description:PDF fileMIME type:application/pdfFile Size:228.4Kb
Author
South Carolina Department of Health and Environmental Control
South Carolina Bureau of Water
Boozer, Alton C.
Subject
Water--Pollution--Total maximum daily load--South Carolina; Bacterial pollution of water--South Carolina; Water--Monitoring--South Carolina; Water--South Carolina--Analysis; Water quality--South Carolina
This letter from Alton C. Boozer, Chief of the Bureau of Water, to Ms. Elizabeth Jones, U.S. EPA, Region 4: Standards, Monitoring and TMDL Branch, is a reply to the request for final TMDL approval for Sanders Branch/Coosawhatchie River, Hampton County, South Carolina. Attached with the letter is the complete, final TMDL package.
Collections
Date
2003-01-07Metadata
Show full item recordDate Accessioned | 2022-05-24T15:22:25Z |
Date Available | 2022-05-24T15:22:25Z |
Item Format | application/pdf |
Media Type | Document |
Rights | Copyright status determined to be in the public domain on April 27, 2020 by United States Supreme Court ruling (Georgia et al., Petitioners v. Public.Resource.Org, Inc. : 590 U.S.__(2020)) |
Type | Text |
Digitization Specifications | This South Carolina State Document was either saved from a document available publicly online in PDF format or converted to PDF using Adobe Acrobat DC. |
Related items
Showing items related by title, author, creator and subject.
-
Load Reduction Management Plan: Upper Little Pee Dee River - PD-029E
Pee Dee Resource Conservation and Development Council (2005-08)The federal Clean Water Act (CWA) directs each state to review the quality of its waters every two years to determine if water quality standards are being met. A Total Maximum Daily Load (TMDL) is a written plan and analysis ... -
Load Reduction Management Plan: Upper Little Pee Dee River - PD-029E
Pee Dee Resource Conservation and Development Council (2005-08)The federal Clean Water Act (CWA) directs each state to review the quality of its waters every two years to determine if water quality standards are being met. A Total Maximum Daily Load (TMDL) is a written plan and analysis ... -
Total Maximum Daily Load for Crowders Creek, North Carolina and South Carolina - Catawba River Basin
North Carolina Department of Environment and Natural Resources. Division of Water Quality (2004-06)The federal Clean Water Act (CWA) directs each state to review the quality of its waters every two years to determine if water quality standards are being met. A Total Maximum Daily Load (TMDL) is a written plan and analysis ...