Show simple item record

dc.creatorRalph Whitehead & Associates
dc.creatorSouth Carolina Department of Transportation
dc.date.accessioned2018-11-29T20:31:56Z
dc.date.available2018-11-29T20:31:56Z
dc.date.issued1993-09
dc.identifier.urihttp://hdl.handle.net/10827/29012
dc.description.abstractThe overall objective of the stormwater control plan is to limit the discharge of sediment from the project site and to prevent postconstruction peak discharge flowrates from exceeding the pre-construction peak discharge flowrates. This manual has been prepared as a guideline for the SCDOT to use in the design of structures to limit the discharge of sediment from highway construction sites.
dc.formatapplication/pdf
dc.format.mediumDocument
dc.languageEnglish
dc.publisherSouth Carolina State Library
dc.relation.ispartofSouth Carolina State Documents Depository
dc.rightsCopyright status undetermined. For more information contact, South Carolina State Library, 1500 Senate Street, Columbia, South Carolina 29201.
dc.subjectUrban runoff--South Carolina--Management
dc.subjectRoads--South Carolina--Design and construction--Handbooks, manuals, etc.
dc.titleInterim stormwater control manual prepared for use by South Carolina Department of Transportation
dc.typeText
sd.specificationsThis South Carolina State Document was either saved from a document available publicly online in PDF format or converted to PDF using Adobe Acrobat DC.


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record