Simplifying the Air Permitting Process : Operating Permits

Authors
South Carolina Department of Health and Environmental Control, Air Permitting Division
Keywords
Air--Pollution--Law and legislation--South Carolina , Air quality management--South Carolina , Environmental permits--South Carolina
Abstract
Any facility that is required to obtain an air quality construction permit issued by the Bureau of Air Quality must obtain an operating permit when the new or altered source is placed into operation. An air operating permit incorporates all applicable state and federal air requirements into one document. The operating permit flow chart here provides an overview of steps for obtaining a new permit.
Description
Loading...
Thumbnail Image
Issue Date
2017-08
Contributor
Date Accessioned
2017-09-28T12:13:56Z
Date Available
2017-09-28T12:13:56Z
Item Format
application/pdf
Media Type
Document
Item Language
English
Publisher
South Carolina State Library
Digital Collection
South Carolina State Documents Depository
Rights
Copyright status undetermined. For more information contact, South Carolina State Library, 1500 Senate Street, Columbia, South Carolina 29201.
Type
Text
Digitization Specifications
This South Carolina State Document was either saved from a document available publicly online in PDF format or converted to PDF using Adobe Acrobat DC.