Simplifying the Air Permitting Process : Operating Permits
-
Description:PDF fileMIME type:application/pdfFile Size:200.9Kb
Author
South Carolina Department of Health and Environmental Control, Air Permitting Division
Subject
Air--Pollution--Law and legislation--South Carolina; Air quality management--South Carolina; Environmental permits--South Carolina
Any facility that is required to obtain an air quality construction permit issued by the Bureau of Air Quality must obtain an operating permit when the new or altered source is placed into operation. An air operating permit incorporates all applicable state and federal air requirements into one document. The operating permit flow chart here provides an overview of steps for
obtaining a new permit.
Collections
Date
2017-08Metadata
Show full item recordDate Accessioned | 2017-09-28T12:13:56Z |
Date Available | 2017-09-28T12:13:56Z |
Item Format | application/pdf |
Media Type | Document |
Item Language | English |
Publisher | South Carolina State Library |
Digital Collection | South Carolina State Documents Depository |
Rights | Copyright status undetermined. For more information contact, South Carolina State Library, 1500 Senate Street, Columbia, South Carolina 29201. |
Type | Text |
Digitization Specifications | This South Carolina State Document was either saved from a document available publicly online in PDF format or converted to PDF using Adobe Acrobat DC. |