The repository is currently being upgraded to DSpace 7. Temporarily, only admins can login. Submission of items and changes to existing items is prohibited until the completion of this upgrade process.

Now showing items 1-4 of 4

    • Construction Permit for New Facility 

      South Carolina Department of Health and Environmental Control (South Carolina State Library, 2016-08)
      This flow chart shows the steps to go through to obtain a construction permit from DHEC.
    • Permitting Process 

      South Carolina Department of Health and Environmental Control (South Carolina State Library, 2016-08)
      This flow chart shows the steps to go through to obtain a construction or environmental permit from DHEC.
    • Prevention of Significant Deterioration (PSD) Construction Permits 

      South Carolina Department of Health and Environmental Control (South Carolina State Library, 2016-08)
      This flow chart shows the steps to go through to obtain a construction and environmental permit from DHEC.
    • Public Notice Process 

      South Carolina Department of Health and Environmental Control (South Carolina State Library, 2016-08)
      This flow chart shows the steps to go through for a public notice process to obtain a construction or environmental permit from DHEC.