Loading...
S.C. regulation 61-56, onsite wastewater systems changes
South Carolina Department of Health and Environmental Control
South Carolina Department of Health and Environmental Control
Abstract
DHEC will not perform a soil evaluation or prepare a system layout for any subdivision or portion of a subdivision with ten or more lots ; backhoe pits shall be required for all sites located above the Fall Line that separates the Piedmont area from the Coastal Plain as defined by the South Carolina Geological Survey ; a 3-tiered system for OSWW system installers has been established.
Issue Date
2022-08-18
Keywords
Sewage disposal in the ground--Law and legislation--South Carolina, Land treatment of wastewater--Law and legislation--South Carolina
Type
Text
Rights
Copyright status determined to be in the public domain on April 27, 2020 by United States Supreme Court ruling (Georgia et al., Petitioners v. Public.Resource.Org, Inc. : 590 U.S.__(2020))
Digitization Specifications
This South Carolina State Document was either saved from a document available publicly online in PDF format or converted to PDF using Adobe Acrobat DC.