Loading...
Guidelines for test pit construction for onsite wastewater system soil evaluation
South Carolina Department of Health and Environmental Control
South Carolina Department of Health and Environmental Control
Abstract
Test pits are required by DHEC for onsite wastewater system soil evaluation if a property is located above the S.C. Fall Line, and may be requested by the Department in cases where the evaluator encounters an obstruction during initial evaluation.
Issue Date
2022-08-11
Keywords
Land treatment of wastewater--South Carolina, Soils--Testing
Type
Text
Rights
Copyright status determined to be in the public domain on April 27, 2020 by United States Supreme Court ruling (Georgia et al., Petitioners v. Public.Resource.Org, Inc. : 590 U.S.__(2020))
Digitization Specifications
This South Carolina State Document was either saved from a document available publicly online in PDF format or converted to PDF using Adobe Acrobat DC.