Loading...
Thumbnail Image
Publication

Specifications for the replacement or new installation of traffic counting, classification or weigh-in-motion systems

South Carolina Department of Transportation
Abstract
This work shall consist of furnishing and installing a Control Box with lightning suppression, Loop Wires, Piezo Film Sensors, Weigh-In-Motion sensors, lead-in wires, pull boxes, conduit and interconnections necessary to replace and upgrade the existing traffic counting, classification or Weigh-In-Motion devices which will be removed by the construction project. All work shall be performed in a satisfactory manner as determined by the SCDO engineer.
Issue Date
2007-02
Keywords
Traffic signs and signals--Specifications--South Carolina
Type
Text
Rights
Copyright status undetermined. For more information contact, South Carolina State Library, 1500 Senate Street, Columbia, South Carolina 29201.
Digitization Specifications
This South Carolina State Document was either saved from a document available publicly online in PDF format or converted to PDF using Adobe Acrobat DC.