Loading...
Interim stormwater control manual prepared for use by South Carolina Department of Transportation
Ralph Whitehead & Associates ; South Carolina Department of Transportation
Ralph Whitehead & Associates
South Carolina Department of Transportation
Abstract
The overall objective of the stormwater control plan is to limit the discharge of sediment from the project site and to prevent postconstruction peak discharge flowrates from exceeding the pre-construction peak discharge flowrates. This manual has been prepared as a guideline for the SCDOT to use in the design of structures to limit the discharge of sediment from highway construction sites.
Issue Date
1993-09
Keywords
Urban runoff--South Carolina--Management, Roads--South Carolina--Design and construction--Handbooks, manuals, etc.
Type
Text
Rights
Copyright status undetermined. For more information contact, South Carolina State Library, 1500 Senate Street, Columbia, South Carolina 29201.
Digitization Specifications
This South Carolina State Document was either saved from a document available publicly online in PDF format or converted to PDF using Adobe Acrobat DC.