Loading...
Thumbnail Image
Publication

Road design reference material for consultant prepared plans for Carolina Crossroads phase 3

South Carolina Department of Transportation
Abstract
This reference material includes: survey, design field review, preliminary right of way plans field review, right of way plans, construction plans, deliverables, verification of deliverables, specifications and bid proposal and revisions.
Issue Date
2023-01-16
Keywords
Bridges--Design and construction--South Carolina--Lexington County, Bridges--Design and construction--South Carolina--Richland County, Roads--Design and construction--South Carolina--Richland County, Roads--Design and construction--South Carolina--Lexington County
Type
Text
Rights
Copyright status determined to be in the public domain on April 27, 2020 by United States Supreme Court ruling (Georgia et al., Petitioners v. Public.Resource.Org, Inc. : 590 U.S.__(2020))
Digitization Specifications
This South Carolina State Document was either saved from a document available publicly online in PDF format or converted to PDF using Adobe Acrobat DC.